Tag Archives: Aquifer

Packet: Levy County Planning Commission, with 3RT Sand Mine Special Exception application 2023-07-10

Update 2023-07-23: Levy County 3RT Sand Mine is in Springshed of Rainbow Springs 2023-07-23.

Only one Levy County Planning Commissioner, a former miner, voted against recommending a Special Exception for a proposed 1,100-acre sand mine, after 70 people testified for four hours under oath that the mine is a bad idea in a rural residential agricultural area.

The county mailed about 2,800 notices in April to residences within two miles of the site, because of the large number of truck trips that would be required, about one every 90 seconds.

When this case comes up before the Board of County Commissioners of Levy County, I recommend interested parties show up and speak. And meanwhile send them a letter or call them.

If approved, this mine will be there for 40 years, and maybe 100 years.

[Collage, 3RT Sand Mine, Levy Count Planning Commission Packet 2023-07-10]

This case will not be heard by the Levy County Commission at its next meeting on Tuesday, July 25, 2023, because on July 18th the Planning & Zoning Office received official notice from the 3RT Sand Mine (SE 23-01) applicant, Ryan Thomas, requesting a continuation to a date uncertain to have time to assess the project with the Planning Commission conditions.

This is a standard developer tactic: delay hoping the opposition will forget. I recommend the opposition keep on it.

The Levy County parcels of the mine site and other parcels proposed for access are shown in yellow on this map. Manatee Spring on the Suwannee River is highlighted towards the left. Levy County staff wrote, “e) Site is not located within one mile corridor (one-half mile on either side) of known geological features with the potential to Impact Manatee Springs or Fanning Springs. Additional study is not recommended to be required.” Apparently the staff believe what DNM Engineering & Associates, Inc., told them on behalf of the miners. I’d prefer to see further study. Continue reading

Agenda: Tifton, GA, meeting, Suwannee-Satilla Regional Water Planning Council 2023-05-24

Update 2023-05-16: Rivers and mining: WWALS comments on Suwannee-Satilla Draft Regional Water Plan 2023-05-15.

We have an agenda for the May 24, 2023, meeting of the Suwannee-Satilla Regional Water Planning Commission (SSRWPC) in Tifton, Georgia.

Note the SRWMD presentation about Minimum Flows and Levels (MFLs), as in the ongoing SRWMD peer review of the Upper and Middle Suwannee River MFLs.

SSRWPC will also be discussing their Lake Beatrice water storage and Alapaha River replenishment scheme, which has assistance from the U.S. Army Corps of Engineers.

Don’t wait until the SSRWPC meeting to get your comments in on their Georgia Regional Water Plan by May 15, 2023.

[The attendees: Sheri Almer and Cliff Lewis of GA-EPD, Emory Gawlik and Shayne Wood of GDM Smith, Council Mac McCall, Chair Scott Downing, Foreground Bert Early of Georgia Forestry, Elizabeth Backe of SGRC, Emily Ducker and Sean King of SRWMD --John S. Quarterman Suwannee Riverkeeper]
SSRWPC meeting 2023-03-14.

Received this morning in response to a WWALS request, Cliff Lewis wrote:

Agenda for the upcoming meeting is below. See you then. Continue reading

Upper and Middle Suwannee River MFL webinar and followon WebBoard meetings 2023-05-02

Update 2023-05-01: Agenda: Upper and Middle Suwannee River MFL webinar and followon WebBoard meetings 2023-05-02 2023-05-02.

SRWMD is having a third Upper & Middle Suwannee River MFL meeting, 1 PM, May 2, 2023, via webinar.

This meeting is not listed on the District’s corresponding web page. And it is not listed in the calendar the meeting notice refers to.

The notice apparently is only posted as Notice: 27066509 in the Florida Administrative Code & Florida Administrative Register.

Ditto for the series of followon WebBoard meetings.

[2023-03-15 MFL meeting]
2023-03-15 MFL meeting

The Suwannee River Water Management District announces a public meeting to which all persons are invited.

DATE AND TIME: May 2, 2023, 1:00 p.m.

PLACE: Continue reading

No phosphate mine waste into recreational lakes, and more transparency –WWALS to Hamilton County BOCC 2023-04-17

You can send your own comments to the addresses in the WWALS letter. If you prefer to telephone, see https://hamiltoncountyfl.com/board-of-county-commissioners/.

The Public Hearing is tomorrow, Tuesday, April 18, 2023, at 6 PM, at 207 NE First Street Jasper, Florida 32052.

WWALS letter to Hamilton BOCC 2023-04-17

See also PDF.

[Letter and mine]
Letter and mine

Continue reading

Hamilton County Planning Commission wants conditions on Nutrien phosphate mine permit renewal 2023-03-28

Update 2023-04-13: More materials: Hamilton County Planning Commission on Nutrien phosphate mine permit renewal 2023-03-28.

Update 2023-04-12: The County Commission meeting will be April 18th.

The Nutrien Phosphate Mine in Hamilton County, Florida, is up for renewal by the Hamilton Board of County Commissioners on Tuesday, April 28 18, 2023, at 6 PM. There will be a Public Hearing. Since time to speak will be limited, best to send written comments in advance.

The renewal request has already been reviewed by the Planning and Zoning Board (PNZ), on March 28, 2023. PNZ recommends renewal with some conditions.

Private landowners, a number of whose property is inside the mine boundary, object that some of Nutrien’s plans for disposal of waste such as clay will adversely affect those landowners’ businesses as well as wildlife and waters.

Dennis J. Price, P.G., of Hamilton County filed a page of questions.

Bienville Outdoors filed a a request to find other options for settling areas.

Maybe you would like to comment on effects of this mine on the Suwannee River, Swift Creek, the Floridan Aquifer, or public health.

[Private landowners, Clay flows, aerial: Nutrien Phosphate Mine, Hamilton County, FL]
Private landowners, Clay flows, aerial: Nutrien Phosphate Mine, Hamilton County, FL

On the WWALS website are Continue reading

All nine Riverkeepers of Georgia oppose the mining permit applications by Twin Pines Minerals too near the Okefenokee Swamp 2023-03-09

I sent this at 4:08 PM today to TwinPines.Comment@dnr.ga.gov:

“Please find attached a letter of opposition by all nine Riverkeepers of Georgia to the mining permit applications by Twin Pines Minerals, LLC.”

[GA Riverkeepers letter for Okefenokee Swamp against strip mine 2023-03-09]

See also the letter by Waterkeepers Florida, representing all fifteen Waterkeepers of Florida. It includes links to the letters by Suwannee and St. Marys Waterkeepers.

You can still send in your own comment.

While the comment period on the Mining Land Use Plan nominally closes at 4:30 PM today, that same address has been open for comments for a year or more, and will probably remain open.

Plus GA-EPD has said that if there is a draft permit, they will open another 60-day public comment period.

Meanwhile, all the Waterkeepers of Georgia and Florida oppose that strip mine for white paint, and support the Okefenokee Swamp, the St. Marys and Suwannee Rivers, and the Floridan Aquifer.

The GA Riverkeepers letter

The letter is below in web form, or see it as PDF. Continue reading

Please stop a strip mine near the Okefenokee Swamp that threatens both Florida and Georgia –Waterkeepers Florida

Update 2023-03-20: All nine Riverkeepers of Georgia oppose the mining permit applications by Twin Pines Minerals too near the Okefenokee Swamp 2023-03-09
Also, you can still send a comment to TwinPines.Comment@dnr.ga.gov.

Waterkeepers Florida, representing all fifteen Waterkeepers of Florida, opposes a titanium dioxide strip mine too near the Okefenokee Swamp, in a letter to Georgia Governor Brian Kemp Friday.

You can still comment to the Georgia Environmental Protection Division by 4:30 PM, Monday, March 20th, and ask Georgia legislators to pass bills protecting the Okefenokee Swamp, the Suwannee and St. Marys Rivers, and the Floridan Aquifer.

[Support the Okefenokee Swamp, not a strip mine --Waterkeepers Florida 2023-03-17]
Support the Okefenokee Swamp, not a strip mine –Waterkeepers Florida 2023-03-17


March 17, 2023

[Logo of Waterkeepers Florida]

Governor Brian Kemp
206 Washington Street
Suite 203 State Capitol
Atlanta, GA 30334
Delivered via email to: brian.kemp@georgia.gov

Re: Please stop a strip mine near the Okefenokee Swamp that threatens both Florida and Georgia

Dear Governor Kemp and staff,

In support of our fellow Waterkeepers’ missions to protect the St. Marys River and the Suwannee River, we, Members of Waterkeepers Florida, are again expressing serious concerns regarding the activities the proposed Twin Pines Minerals, LLC (TPM) application number SAS-2018-00554-SP-HAR will have on the Okefenokee Swamp, its river systems, and the Floridan Aquifer. Waterkeepers Florida is a regional entity composed of all 15 Waterkeeper organizations working in the State of Florida to protect and restore our water resources across over 50,000 square miles of watershed, which is home to over 15 million Floridians.

Continue reading

WWALS Public Comments on Mining Land Use Plan of Twin Pines Minerals, LLC, too near the Okefenokee Swamp 2023-03-17

March 17, 2023

Land Protection Branch,
4244 International Parkway,
Atlanta Tradeport- Suite 104,
Atlanta, Georgia 30354

twinpines.comment@dnr.ga.gov

RE: WWALS Public Comments on Mining Land Use Plan of Twin Pines Minerals, LLC (PDF)

Dear EPD,

This letter recommends denying the permit applications by Twin Pines Minerals, LLC (TPM) to mine for titanium dioxide (TiO2) near the Okefenokee Swamp, based on specifics of the Mining Land Use Plan,1 as requested in the Notice of the Opportunity for Public Comment.2

[Please deny the mining permits]
Please deny the mining permits

Why this decision is important far away

First, we present some context for why this decision is important far away from the Okefenokee Swamp.

Any lowered water level or dewatering of the surface around the Swamp increases the risk of fires. The 2007 Bugaboo fire spread smoke west across the Suwannee River Basin, causing respiratory distress 80 miles away in Quitman, continuing 450 miles to Meridian, Mississippi. Southwards the smoke closed I-75 and went 370 miles to Fort Lauderdale, Florida. North it went 250 miles to Atlanta.

During the 2017 West Mims fire, Lowndes County Fire (along with Valdosta and its other cities, and nearby counties) sent assistance from 75 miles away. They were among 900 firefighters from across the country.3 “There’s nobody Continue reading

Videos: Morven Solar denied @ Brooks County Commission 2023-02-06

After two hours of speakers in the Public Hearing, the Brooks County Commission this Monday denied the Special Exception for Morven Solar, 3:1:1.

[Speakers, Decision: Morven Solar @ Brooks County Commission 2023-02-06]
Speakers, Decision: Morven Solar @ Brooks County Commission 2023-02-06

Commissioner Myra Exum, after saying that whatever the Commissioners did they would be wrong, Continue reading

Water budget, limit water withdrawals, do better aquifer recharge –WWALS to NFRWSP 2023-01-31

Sent as PDF.


January 31, 2023

To: SRWMD, SJRWMD, partnership@sjrwmd.com

Re: Water budget, limit water withdrawals, do better aquifer recharge, NFRWSP

Dear Water Management Districts,

Thank you for the opportunity for public input.

[Not every demand needs water withdrawals]
Not every demand needs water withdrawals

At the November 15, 2022, public meeting about the North Florida Regional Water Supply Plan (NFRWSP), I thanked the presenters for all the hard work they had put into the details, such as in the North Florida-Southeast Georgia (NFSEG) regional groundwater flow model .

I have some issues with another level. I noticed repeated assertions in the public meeting that demand or projected demand are just taken as givens. So basically anybody who wants to build a golf course, or start another titanium mine, or plant almond trees that need lots of water, that’s just a given, that’s demand.

Continue reading