Tag Archives: e. Coli

Reschedule Retry Sugar Creek to Troupville Chainsaw Cleanup, Withlacoochee River 2023-08-19

Hoping for higher and cleaner river water, this time we are aiming at 9 AM, Saturday, August 19, 2023, to chainsaw one big deadfall between I-75 and GA 133 on the Withlacoochee River, and maybe a few more between GA 133 and the Little River Confluence.

For our original date, the river level was two feet below our recommended level of 116′ NAVD88, and Valdosta had just reported very high E. coli in that stretch.

On this new date of August 19th, we may also use a put-in closer to our main deadfall target. Bring a rope on at least one end of your boat for lowering it in there. Bring a chainsaw if you really know how to use it, but you do not have to saw to join us.

Our main target this time is one remaining big deadfall between I-75 and GA 133.

When: Gather 9 AM, launch 9:30 AM, end 4 PM, Friday, August 19, 2023

Put In: Meet at the back of the Salty Snapper parking lot, 1405 Gornto Rd, Valdosta, GA 31602 and we’ll go to the put-in from there.

GPS: 30.861764, -83.318854

[Crowe Deadfall 2022-07-30; Riverhill Drive Deadfall 2022-10-16; Reschedule Retry Sugar Creek to Troupville Chainsaw Cleanup, Withlacoochee River 2023-08-19]
Crowe Deadfall 2022-07-30; Riverhill Drive Deadfall 2022-10-16;
Retry Sugar Creek to Troupville Chainsaw Cleanup, Withlacoochee River 2023-08-19

Continue reading

Very bad water quality at US 41 and GA 133 Monday 2023-07-31

Update 2023-08-02: Reschedule Retry Sugar Creek to Troupville Chainsaw Cleanup, Withlacoochee River 2023-08-19.

Valdosta’s Withlacoochee River water quality results for Monday, July 31, 2023 were very bad at US 41 (North Valdosta Road) and GA 133. Bad was 12,000 cfu/100 mL of E. coli at US 41, which is twelve times the alert limit of 1,000.

There was intermittent rain over the weekend upstream from Valdosta, which probably washed contamination into the river.

Judging by the previous WWALS creek tests, most likely that contamination came down Cat Creek. More testing is needed to find out what it is.

[Problem spots and context 2023-07-31]
Problem spots and context 2023-07-31

Those locations are north and west of Valdosta. Continue reading

Clean Withlacoochee River, filthy Crawford and Sugar Creeks 2023-07-28

Update 2023-08-02: Very bad water quality at US 41 and GA 133 Monday 2023-07-31.

The Withlacoochee River tested good for Friday in WWALS sampling, but Crawford Branch and Sugar Creek were each above the one-time test limit for E. coli.

The Sugar Creek result is presumably due to ongoing effects from Valdosta’s July 17th 6,000 gallon sewage spill into Hightower Creek “behind the Target,” reported as at 1700 block River Street. This follows the disturbing Sugar Creek results Valdosta Utilities told us about Friday a week ago, after which we converted a cleanup paddle into an on-land cleanup.

We do not have any downstream results because the WWALS volunteer water quality testing program is short-handed this week. Maybe you’d like to become a WWALS tester; please fill out this form:
https://forms.gle/DzWvJuXqTQi12N6v7

No new sewage spills have been reported in the Suwannee River Basin in Georgia or Florida.

Rain fell hard today, but only briefly, so most of the rivers are probably OK for fishing, swimming and boating this weekend, although we have no downstream test results to tell.

I’d avoid the Withlacoochee River downstream from Sugar Creek as far as the Little River Confluence.

[Chart, River and Creeks, Swim Guide Map 2023-07-28]
Chart, River and Creeks, Swim Guide Map 2023-07-28

The most recent results we have from Valdosta are for Wednesday upstream and Wednesday two weeks ago downstream. For Monday Valdosta got way-too-high results for US 41 Continue reading

Valdosta notified GA-EPD four days after the latest Knights Creek sewage spill 2023-07-06

Update 2023-07-29: Clean Withlacoochee River, filthy Crawford and Sugar Creeks 2023-07-28.

That word “immediately,” I don’t think it means wait yet another day before informing the public, after Valdosta Utilities already waited four days to tell GA-EPD about the sewage spill.

Even though Valdosta wrote to GA-EPD, “we did not observe any direct flow to the creek,” Valdosta’s own state-required followup testing showed too-high Fecal coliform and E. coli in Knights Creek a week later, downstream, but not upstream, of the spill. Just because they didn’t see the sewage running over the ground doesn’t mean it’s not seeping through the vegetation or the ground itself.

Maybe you’re as tired as I am of Valdosta blaming sewage spills on contractors. Who hires the contractors? Who supervises them? Why doesn’t Valdosta’s fancy SCADA system alert the city to these spills early, where, when, and how much?

The information seemed pretty skimpy that Valdosta Utilities supplied to the public about its July 6, 2023, sewage spill into Knights Creek. Also, I wanted to know when did Valdosta tell GA-EPD, since that spill did not show up in GA-EPD’s Sewage Spills Report for a long time, Not until after I asked GA-EPD about it, actually, even though Valdosta City Manager Richard Hardy had said he would look into that.

So I filed an open records request with the City of Valdosta for all communications between Valdosta and GA-EPD about Valdosta’s last three sewage spills. I only got back information about the Knights Creek spill, so here is that much.

[Where, When, After: Valdosta's Knights Creek Sewage Spill 2023-07-06]
Where, When, After: Valdosta’s Knights Creek Sewage Spill 2023-07-06

Let me say that recent communications from Valdosta Utilities have been much improved in recent days, coming from Assistant Director Jason Barnes. Barnes took it upon himself to warn WWALS about contamination in Sugar Creek before the cleanup paddle we had scheduled for last Saturday, so we converted it into an on-land cleanup. That elevated Fecal coliform and E. coli came from Valdosta’s July 17, 2023, spill into Hightower Creek near River Street, upstream from Sugar Creek and the Withlacoochee River. Reporting for that July 17th spill was much better: a press release went out the next day, and it also appeared in GA-EPD’s Sewage Spills Report the day after the spill. And Jason Barnes showed up in person to see about getting a warning sign placed at Sugar Creek.

Back to the July 6, 2023, spill into Knights Creek, above Mud Swamp Creek, the Alapahoochee River, and the Alapaha River.

Utilities Director Bradley L. Eyre did not write to the Georgia Environmental Protection Division (GA-EPD) until July 10th, four days after the spill was discovered on July 6th. Continue reading

Pictures: Sugar Creek Withlacoochee River on-land cleanup 2023-07-22

Thanks to Russell Allen McBride for leading the rerouted on-land Sugar Creek and mostly Withlacoochee River cleanup. Children and experienced adults teamed up to get the job done. We found only one big trash jam and we cleaned that one up.

Phil Hubbard came with boat and chainsaws ready to do a chainsaw cleanup, but due to the reroute there was no chainsawing.

We thanked Valdosta Assistant Utilities Director Jason Barnes for alerting us to the sewage spill contamination in Sugar Creek that caused us to reroute from a cleanup paddle to an on-land cleanup. He arrived before we left, so we thanked him again in person.

[Before, WaterGoat, Trashjam, Level log, after, Sugar Creek, Withlacoochee River 2023-07-22]
Before, WaterGoat, Trashjam, Level log, after, Sugar Creek, Withlacoochee River 2023-07-22

Yes, Vivian, there could be alligators. Continue reading

Clean Little, Withlacoochee, and Alapaha Rivers, but warning 2023-07-20

Update 2023-07-29: Clean Withlacoochee River, filthy Crawford and Sugar Creeks 2023-07-28.

Update 2023-07-22: Valdosta sewage spills bad for people, wildlife, economy –Suwannee Riverkeeper on WTXL.TV 2023-07-21.

The Alapaha, Little, and Withlacoochee Rivers tested good for Thursday in WWALS sampling. But there are ongoing effects from a couple of Valdosta sewage spills, plus a new one from Quitman.

Valdosta Utilities tells us of some disturbing results on Sugar Creek, downstream of the Valdosta spill of July 17th and upstream of the Withlacoochee River. (I would publish those test results, but I do not have them in writing.)

Because of those results, we have converted tomorrow’s cleanup paddle to an on-land cleanup.

If you do paddle this weekend, I recommend the Little or Alapaha Rivers, or the Ichetucknee, Santa Fe, or Suwannee.

Also, Quitman had a 12,500 gallon sewage spill on July 11th that was just reported today. That goes into Okapilco Creek into the Withlacoochee River.

No other sewage spills have been reported in the Suwannee River Basin in Georgia or Florida.

[Chart, Rivers, Swim Guide Map 2023-07-20]
Chart, Rivers, Swim Guide Map 2023-07-20

The most recent results we have from Valdosta are for Monday upstream and Wednesday a week ago downstream. For Monday Valdosta got way-too-high results for US 41, GA 133, and US 84 on the Withlacoochee River. WWALS got a much better result for Thursday at US 41. We did not test at GA 133 or US 84, expecting to get Valdosta’s Wednesday results. No such luck.

FYI, GA 133 is on the route the Valdosta Mayor and City Council member were supposed to paddle with us tomorrow. You’d think Valdosta would have tested and reported in a timely manner before that. But they did not.

Meanwhile, Valdosta’s followup testing after its July 6, 2023, 194,251-gallon raw sewage spill into Knights Creek keeps showing way too-high Fecal coliform and E. coli downstream on Knights Creek, which is upstream of the Alapahoochee, Alapaha, and Suwannee Rivers. I have to wonder whether Valdosta has had more spills that it has not reported, possibly because it does not know about them. Continue reading

Reroute: Sugar Creek and Troupville Withlacoochee River on-land cleanup 2023-07-22

Update 2023-07-22:Pictures: Sugar Creek Withlacoochee River on-land cleanup 2023-07-22.

Due to bad water quality reports for Sugar Creek heard from the City of Valdosta, we are revising the cleanup from a paddle to an on-land cleanup. Please come to Sugar Creek at 9AM to hear where we will go from there.

When: Gather 9 AM, launch 9:30 AM, end 1 PM, Saturday, July 22, 2023

Where: Meet at the back of the Salty Snapper parking lot, 1405 Gornto Rd, Valdosta, GA 31602 and we’ll go to appropriate locations from there.

GPS: 30.861764, -83.318854

[At Langdale Park Boat Ramp: Caution Sewage Spill City of Valdosta --Bobby McKenzie 2023-07-21]
At Langdale Park Boat Ramp: Caution Sewage Spill City of Valdosta –Bobby McKenzie 2023-07-21

Bring: Cleanup materials will be provided, but if you’ve got a trash picker, bring it along. Bring sturdy shoes and clothes, drinking water, and snacks.

There is no need to bring a boat. Continue reading

Knights Creek tested too high for E. coli before Valdosta reported the latest spill 2023-07-10

Update 2023-07-26: Valdosta notified GA-EPD four days after the latest Knights Creek sewage spill 2023-07-06.

Update 2023-07-18: Another Valdosta River Street Spill into Hightower Creek 2023-07-17.

Valdosta’s own water quality tests of Knights Creek showed way too high E. coli for the day before Valdosta’s press release about its most recent sewage spill into Knights Creek.

[Map and Report]
Map and Report

I don’t know whether these tests were done by Valdosta’s downstream testing contractors or by their in-house people. If the latter, it seems likely that Valdosta knew of these Monday results before the city issued a press release the next day at 6:24 PM Tuesday, July 11, 2023. Yet there is no mention of them in the press release.

Valdosta got even higher results for March 29th, with a note: “Possible cause of high results on 3/29 was substantial rainfall in area.”

But Valdosta also got too-high results for March 30th (above the one-time test limit of 410), on June 13th (above the alert limit of 1,000), and on June 21st (above the one-time test limit). I’m not finding records of rain on Valdosta at all these dates. Plus if that was the cause, why are the too-high results all only for the BELOW location and not the ABOVE location? Has Valdosta had more sewage spills than they have reported?

Speaking of reported, neither this spill nor Valdosta’s previous spill have shown up in the GA-EPD Sewage Spills Report. I have asked GA-EPD about that.

These Knights Creek test results are according to data on the city of Valdosta Utilties Department web pages, 2023 Knight’s Creek Biological Monitoring Results. Continue reading

Clean Withlacoochee River 2023-07-13

The Little and Withlacoochee Rivers tested good for Thursday.

River water levels are well within boatable range.

There was rain today, and more is expected tomorrow, so contamination could wash into the rivers.

No sewage spills have been reported in the past week in the Suwannee River Basin in Georgia or Florida.

So fish, swim, and boat at your own risk this weekend.

Maybe you’d like to join us tomorrow, Withlacoochee Springs and Slough, Sullivan Launch 2023-07-15.

[Chart, River, Swim Guide Map 2023-07-13]
Chart, River, Swim Guide Map 2023-07-13

Valdosta’s major spill of 2023-07-06 still has not shown up in the GA-EPD Sewage Spills Report.

The Valdosta Williams Street One Mile Branch sewage spill of June 21st still has not shown up in the GA-EPD Sewage Spills Report. The Valdosta City Manager two weeks ago promised to look into that.

Ashburn had three spills two weeks ago, one of them major, all finally reported this Wednesday. We’ll post a writeup on those later. Continue reading

Clean Little and Withlacoochee River 2023-07-06

Update 2023-07-11: Yet another Valdosta sewage spill, five days ago, at 1800 E. Park Ave., Knights Creek 2023-07-06.

The Little and Withlacoochee Rivers tested good for Thursday.

There’s been hardly any rain this week to wash any contamination into the river.

No rain is predicted until Saturday afternoon at the earliest.

No sewage spills have been reported in the Suwannee River Basin in Georgia or Florida.

River water levels are well within boatable range.

So happy fishing, swimming, and boating this weekend!

[Chart, Rivers, Swim Guide Map 2023-07-06]
Chart, Rivers, Swim Guide Map 2023-07-06

The most recent Valdosta results we have are for Wednesday upstream and Monday downstream. They are all good.

Valdosta did see an odd too-high spike in E. coli at GA 133 on the Withlacoochee River for Monday, but by Wednesday it was back down.

The Valdosta Williams Street One Mile Branch sewage spill of June 21st still has not shown up in the GA-EPD Sewage Spills Report. The Valdosta City Manager a week ago promised to look into that. Continue reading